Reference assignment

Examples of problem statement, solution and results from our assignments.

Non-destructive testing of tension cables on Herøysund Bridge in Norway

A decision to demolish the Herøy Bridge in Norway led to a major research project to map the extent of the damage in detail. Invator AB was entrusted to carry out the non-destructive testing on the bridge to identify voids and corrosion in all casings.

Read more about the project

Independent verification of the Big Creek Bridge in Alaska

Independent verification of Big Creek Bridge Problem solving During the casting of a new bridge on the Alaska Highway, complications arose and a large number of casting wounds were noted on the underside of the bridge deck. Were the casting wounds superficial or were there also deeper damages further into the structure?

Read more about the project

Non-destructive testing of tension cables in Vallbybron, Västerås

Invator Sverige AB was commissioned by SWECO to carry out a special inspection of the tension cables on Vallbybron in Västerås. Leaks and the discovery of a large amount of chlorides created doubts about the status of the tension cables.

Read more about the project

Inspection and permit assessment of swimming pool in Västervik

Invator Sverige AB was commissioned by the municipality of Västervik to inspect and develop a solution for the repair of a swimming pool in Västervik. The pool had extensive reinforcement corrosion and loose concrete cracking.

Read more about the project

Repair of cracks in chimney

Vertical cracks from the top of YARA's chimney raised concerns about its condition and load-bearing capacity. This required a comprehensive inspection and analysis to assess the severity of the cracks, identify the causes, and propose measures for the safety and long-term sustainability of the structure.

Read more about the project

Compilation of innovation systems for customers

The customer wanted to be able to identify customer needs and demand at earlier stages. From waiting for orders to a more active approach.

Read more about the project

Calculation and modeling of concrete mast foundations

It was feared that the load-bearing capacity of the mast foundation with a 240 m high mast was impaired. Would it hold or was the risk of collapse imminent?

Read more about the project

Monitoring stresses in a railway bridge with Structural Health Monitoring

Cost-effective monitoring of cracks and stresses in the reinforcement of a railway bridge with full data collection. This is how it was done.

Read more about the project

Renovation of parking garage

The parking garage had cracks in the columns and floors and corrosion deposits due to lack of maintenance. This is how we solved the problem.

Read more about the project

Non-destructive testing of concrete bridge

Damage to existing tension cables in concrete structures, especially rough structures, is extremely complicated to map. So we solved the problem with tomography.

Read more about the project

Carbon fiber reinforcement of rough concrete columns

The 40-year-old concrete columns of the industrial premises were extensively damaged due to corrosion and overloading. This is how we solved the repair with minimal disruption.

Read more about the project

Get in touch with us. We will solve your problems.

Would you like to get in touch with one of our experts? Fill in your details in the form and we will contact you. You can also send your request by email if you prefer.

Kontaktformulär ENG